MLB Creative/Choice Wireless

Home | Classifieds | Place an Ad | Public Notices | Galleries | Milestones | Contact Us | Subscribe | e-newsletter | RSS | GrandCanyonTourGuide.com
Navajo-Hopi Observer | Flagstaff, Arizona

home : latest news : local August 19, 2014


3/18/2014 10:16:00 AM
ADOT begins work to widen U.S. 89 through Cameron
Navajo-Hopi Observer


CAMERON, Ariz. - Work to widen U.S. 89 to four lanes through Cameron, a primary travel route that connects Flagstaff, southern Utah and popular tourist destinations in the Page/Lake Powell region has begun.

U.S. 89 runs through the community of Cameron within the Navajo Nation, approximately 50 miles north of Flagstaff.

During construction on the $36.7 million project, the Arizona Department of Transportation (ADOT) will expand U.S. 89 to two lanes in each direction between State Route 64 and the Little Colorado River (mileposts 464-467), expanding the road from two lanes to four. The construction also includes the removal and replacement of the existing U.S. 89 Cameron Truss Bridge, which was built in 1959, with two new bridges at that location.

Additional improvements on U.S. 89 through Cameron include constructing a roundabout at the existing intersection of U.S. 89 and SR 64, new sidewalks, streetlights and four pedestrian/livestock underpasses.

ADOT expects the two major phases of construction to be complete by the fall of 2016. During phase I of construction, all traffic will remain on the current alignment. During phase II of construction, ADOT will move all traffic onto the newly constructed roadway, which ADOT expects to be completed by the summer of 2015.

ADOT warns that traffic delays may occur during construction with traffic reduced to one lane. Directional signs and flaggers will direct traffic during construction. ADOT advises motorists to be alert for construction equipment and work crews, and to proceed through the work zone with caution.

U.S. 89 between Bitter Springs and Page is currently closed because of the Feb. 20, 2013 landslide, with construction on the emergency repair of the roadway expected to start in early summer of 2014, if there are no environmental, utility or right-of-way hurdles. The repair on this section of the roadway is currently estimated to cost $25 million. The project will include moving the roadway about 60 feet toward Echo Cliffs and using that rock to construct a down slope buttress to stabilize the area.

Motorists traveling on U.S. 89 between Page and Flagstaff can bypass the landslide closure by using the newly paved, 44-mile-long U.S. 89T route that runs parallel to U.S. 89 from The Gap to LeChee. U.S. 89T is the former Navajo Route 20 that connects with U.S. 89 approximately 17 miles north of the U.S. 160 junction (Tuba City exit).

With the reconstruction of the landslide-damaged portion of U.S. 89 not expected to start until early this summer, ADOT, along with the Navajo Nation and Federal Highway Administration, pursued paving Navajo Route 20 (which became the US 89T route) to serve as a short-term solution.

More information on the U.S. 89 widening project through Cameron is at www.azdot.gov/us89cameron.








    Recently Commented    
EPA accepts NGS alternate emmissions proposal
Navajo Code Talker Edward B. Anderson dies in Phoenix July 20 at age 86
Guest column: Colorado River tribes should oppose Escalade Confluence project
Prosecutor to group trials of former Navajo Nation Council members
Letter: What does the term 'Navajo' really mean?




Article Comment Submission Form
Comments are not posted immediately. Submissions must adhere to our Use of Service Terms of Use agreement. The email and phone info you provide will not be visible to the public. Rambling or nonsensical comments may not be posted. Comments are limited to 1300 characters or less. In order for us to reasonably manage this feature we may limit your comment entries to five(5) per day.
Submit an Article Comment
First Name:
Required
Last Name:
Required
Telephone:
Required
Email:
Required
Comment:
Required
Passcode:
Required
Anti-SPAM Passcode Click here to see a new mix of characters.
This is an anti-SPAM device. It is not case sensitive.
   


Advanced Search

HSE - We want to hear from you
Find more about Weather in Flagstaff, AZ
Click for weather forecast





Submission links
 •  Submit site feedback or questions

Find It Opinions Features Extras Submit Other Publications
Home | Classifieds | Place an Ad | Public Notices | Galleries | Milestones | Contact Us | Subscribe | e-newsletter | RSS | Site Map
Larry Green

© Copyright 2014 Western News&Info, Inc.® The Navajo-Hopi Observer is the information source for the Navajo and Hopi Nations and Winslow area communities in Northern Arizona. Original content may not be reprinted or distributed without the written permission of Western News&Info, Inc.® Navajo-Hopi Observer Online is a service of WNI. By using the Site, nhonews.com ®, you agree to abide and be bound by the site's Terms of Use and Privacy Policy, which prohibit commercial use of any information on the site. Click here to submit your questions, comments or suggestions. Navajo-Hopi Observer Online is a proud publication of Western News&Info Inc.® All Rights Reserved.

Software © 1998-2014 1up! Software, All Rights Reserved